In the last week a lot has changed here with a large channel being dug out, adjacent to the footpath. The river flow has now been diverted down this channel, which will allow work to start on creating an enhanced ‘official’ river channel on the opposite side. A long bank, or bund, will then separate the river channel from the open pond area.


Over twenty years worth of silt has so far been dug out to create this channel. While it looks messy at present it should soon start to look a lot better. The work is scheduled to take about a month.
You can find more about the background of this on our Glassmill Pond Restoration Project page